C-ION turbine type: IXS1-160 Application: Suppression of bulking sludge Duration: Permanent operation [read more]

Tenneco Gliwice / Poland
Flow rate: 173 m³/d up to 7.2 m³/h Cartridge: 64 pcs. Modules: 3 Start up: 2021 [read more]

Großarl heating plant (Austria)
Qd 33 m³ / d max. inflow / max. flow 2 m³ / h EGW60 / p.e.60 220 C-MEM modules 2 C-MEM [read more]

Spernal ANMBR WWTP – Severn Trent (England)
Qd 200 m³/d max. inlet / max. flow 20.7 m³/h EGW60 / p.e.60 382 C-MEM modules 3 C-MEM cartridges 192 commissioning 2021 [read more]

Drinking water treatment plant Sonnenplateau Camping Gerhardhof
Flow rate: up to 20 m³/h Units: 22 Commissioning: 2020 C-MEM Zero units, connected in parallel, filter all drinking water for operation, safely removing [read more]

SMART UF – Containerized High Performance Ultrafiltration System
Flow: up to 200 m³/d Modules: 2 Start-up: 2020 The SMART UF system is a preassembled containerized water / wastewater treatment system and [read more]

Arreigada WWTP – Portugal
treatment of municipal wastewater 45,333 p.e. 10,000 m³/d – with a peak flux of 1,000 m³/h the plant is one of the largest MBR [read more]

Eneco Utrecht WWTP Line 2 – Netherlands
Since 2019 the condensate from flue gas cleaning in the biomass heating plant of the Dutch energy supplier Eneco in Utrecht has been treated [read more]

Drinking Water Treatment Plant Gosau – Austria
500 l / d treatment of karst water from the Dachstein for private household start-up: 2020 [read more]

Recooling Water Treatment Plant Düsseldorf University – Germany
treatment of recooling water up to 100 m³/d 3 units with 4 C-MEM cartridges each start-up: 2019 [read more]

Affinity Water WWTP – Great Britain
Pilot plant C-ION turbine type: IXS1-200 Application: removal of metaldehyde and industrial chemicals, suppression of bulking sludge Duration: pilot test 3 – 6 months [read more]

Emschermündung Dinslaken WWTP – Germany
Pilot plant C-ION turbine type: IXS3-200 Application: suppression of bulking sludge, removal of trace substances (diclofenac, sulfamethoxazole, carbamazepine) Duration: pilot test 3 – 6 [read more]

Drochtersen WWTP – Germany
Pilot plant C-ION turbine type: IXS3-200 Application: suppression of bulking sludge Duration: pilot test 3 – 6 months [read more]

Serzedo WWTP – Portugal
Pilot plant C-ION turbine type: IXS3-200 Application: removal of organic substances (COD, TOC, trace substances) Duration: pilot test 3 – 6 months [read more]

Berglandmilch Wörgl WWTP – Austria
C-ION turbine type: IXS3-200 Application: suppression of bulking sludge Duration: permanent operation [read more]

Eneco Utrecht WWTP – Netherlands
In the biomass heating plant of the Dutch energy supplier Eneco in Utrecht the condensate from flue gas purification is treated with the MBBR [read more]

Alpine Hut Wiesberghaus WWTP – Austria
treatment of wastewater in an alpine hut in the Dachstein area with the C-MEM MBBR technology for reuse as toilet flushing 70 p.e. / [read more]

Obstpressgenossenschaft Hager Hochfeld WWTP- Austria
industrial wastewater from juice production 10 m³/d 100 p.e. 3 modules / 18 cartridges start-up: 2017 [read more]

R+Z Klagenfurt WWTP – Austria
Qmax: 400 m³/d Modules: 3 Start-up: 2017 Condensate treatment in biomass heating plant In R+Z Klagenfurt biomass heating plant the condensate from flue gas cleaning is [read more]

Holzindustrie Pfeifer WWTP – Austria
Qmax: 270 m³/d Modules: 2 Start-up: 2017 Condensate treatment in biomass heating plant In Kundl the condensate of the gas purification in Holzindustrie Pfeifer Co.´s biomass heating plant is [read more]

Domestic and industrial water treatment and grey water use
The worldwide proven AQUALOOP-System with C-MEM membranes has produced germ-free water from surface water, groundwater, small wastewater treatment plant effluent, industrial wastewater or grey [read more]

Oberhofen WTP – Austria
15 p.e. start-up: 2015 drinking water treatment in a private drinking water storage tank by separation of Fe and turbidity [read more]

Bischofshofen Small WWTP – Austria
8 p.e. 1.2 m³/d start-up: 2015 small WWTP for municipal wastewater from 2 private households [read more]

Prerov WWTP – Czech Republic
conventional technology: single-stage continuous flow system 130,000 p.e. 76,800 m³/d start-up: 2000 [read more]

Brno-Modrice WWTP – Czech Republic
conventional technology: single-stage continuous flow system featuring mechanical stage, biological stage, sludge treatment 513,000 p.e. 168,000 m³/d start-up: 2001 [read more]

Cork WWTP – Ireland
8 C-TECH basins 450,000 p.e. 167,000 m³/d max. Carrigrenan, Little Island municipal / industrial wastewater from Cork brewery largest C-TECH plant in Europe start-up: 2003 [read more]

Bergern WTP – Austria
30 m³/d 1 module start-up: 2014 Drinking water treatment plant for the village of Bergern. Capacity up to 30 m³/day with the C-MEM technology. [read more]

Krk WTP (Pilot Plant) – Croatia
120 m³/d 1 module Start-up: 2014 Drinking water treatment plant for the recycling of backwash water effluent of existing sand filter system. Capacity up [read more]

Coca Cola Sarajevo WWTP – Bosnia
industrial wastewater from bottling plant 9,500 p.e. 1,000 m³/d start-up: 1998 [read more]

Coca Cola Solin WWTP – Croatia
industrial wastewater from bottling plant 17,000 p.e. 1,000 m³/d start-up: 1996 [read more]

Hungrana WWTP – Hungary
industrial wastewater from starch production 44,000 p.e. 5,750 m³/d start-up: 2007 [read more]

Zywiec WWTP – Poland
4 C-TECH basins 207,000 p.e. 42,000 m³/d max. municipal and industrial (brewery) start-up: 2009 [read more]

Bekescsaba WWTP – Hungary
102,000 p.e. 20,960 m³/d start-up: 2012 [read more]

Neubrandenburg WWTP – Germany
4 C-TECH basins 140,000 p.e. 79,200 m³/d max. start-up: 1999 [read more]

Prostejov WWTP – Czech Republic
4 C-TECH basins 108,000 p.e. 21,500 m³/d DWF start-up: 2001 [read more]

Glendullan Distillery WWTP – Great Britain
wastewater from whisky distillery 9,750 p.e. 1,700 m3/d start-up: 2015 [read more]

Dailuaine Distillery WWTP – Great Britain
wastewater from whisky distillery 6,583 p.e. 1,512 m³/d max. DWF start-up: 2012 [read more]

Slavonski Brod WWTP – Croatia
4 C-TECH basins 80,000 p.e. 26,016 m³/d max DWF start-up: 2013 [read more]

Tychy WWTP – Poland
rehabilitation and upgrading of Tychy WWTP with C-TECH technology 89,100 p.e. 24,000 m³/d mx. DWF start-up: 2005 [read more]

Tulcea WWTP – Romania
municipal wastewater treatment 100,000 p.e. 15,940 m³/d DWF start-up: 2012 [read more]

Znojmo-Dobsice WWTP – Czech Republic
first large scale C-TECH plant in Europe for 99,000 p.e. / 19,000 m³/d municipal wastewater / wastewater from vegetable processing industry and winery start-up: [read more]

Sarajevo Landfill WWTP – Bosnia
PE 8,667 Qmax: 432 m³/d Modules: 12 Municipal landfill leachate treatment plant In Sarajevo, Bosnia, the leachate of a municipal landfill is treated by 12 C-MEM [read more]

Thornton WWTP – Great Britain
PE 2,567 Qmax: 20 m³/d Modules: 1 Effluent treatment of biomethanisation plant In Thornton, Great Britain, 20 m³/d effluent of a municipal waste treatment plant [read more]

Bosnalijek WWTP – Bosnia
PE 100 Qmax: 35 m³/d Modules: 2 Pharmaceutical production effluent treatment plant In Sarajevo, Bosnia, a plant with 2 modules, consisting of totally 72 C-MEM [read more]

Leyland WWTP – Great Britain
PE 2,567 Qmax: 20 m³/d Modules: 1 Effluent treatment of biomethanisation plant In Leyland, Great Britain, 20 m³/d effluent of a municipal waste treatment [read more]

Flachau WWTP – Austria
Qmax: 70 m³/d Modules: 4 Condensate treatment of biomass heating plant In Flachau the condensate of the gas purification in a biomass heating plant [read more]